Vancouver, BC — January 12, 2026 — Leads & Copy — Silver North Resources Ltd. (TSX-V: SNAG, OTCQB: TARSF) has announced the results from the remaining two holes of its 2025 exploration program at the Haldane Silver Property in the Keno Hill Silver District, Yukon. The results include 2.80 meters averaging 1,069 g/t silver and 1.41 g/t gold in hole HLD25-36.
The company reports that the Main Fault mineralization was intersected in drilling on three sections during the 2025 program, representing approximately 100 meters of strike extent and 150 meters downdip. Strong gold values are consistent with previous Main Fault intersections.
The company completed a total of eight holes (1,759.5 meters) in the 2025 program, with seven successfully testing the Main Fault. These holes intersected silver-bearing siderite-sulphide vein and vein breccia mineralization. One hole (HLD25-37) was abandoned within the interpreted Main Fault, and no core was recovered.
The road-accessible 8,579 hectare Haldane Property is located 25 km west of Keno City, YT, adjacent to Hecla Mining’s Keno Hill Silver Mine property. The property hosts numerous occurrences of silver-lead-zinc-bearing quartz siderite veins, similar to the ore-bearing veins mined at Keno Hill.
“The Main Fault is showing itself to be a strong and complex fault structure capable of hosting high grade silver, gold, lead and zinc mineralization,” said Jason Weber, P.Geo., President and CEO of Silver North. “We are in the early days of revealing the potential of this target, one of three new discoveries Silver North has made so far on the property.”
According to Weber, with funding in place to start the 2026 program as early as possible, the company will plan the next program to further define the potential of the Main Fault and other targets at Haldane.
HLD25-36 and 38 were drilled off section to test for structures oblique to the Main Fault, and to investigate the continuity of vein and structure internal to the Main Fault complex.
As with other intersections at the Main Fault and elsewhere on the Haldane property, mineralization in both holes consists of siderite +/- quartz, galena and sphalerite veins and breccias, as well as strongly faulted and ground up vein and vein breccia material.
Significant results from HLD25-36 include 9.10 meters averaging 428 g/t silver, 0.73 g/t gold, 5.26% lead and 1.73% zinc from 182.40 meters down hole, including 2.80 meters averaging 1,069 g/t silver, 1.41 g/t gold, 12.60% lead and 3.02% zinc.
HLD25-36 intersected two splays of the Main Fault over 31 meters, starting at 161.0 m, separated by 18.25 meters of weaker structurally influenced quartzite, phyllitic quartzite, and phyllite with anomalous silver between the upper and lower splay. The entire 161.00 to 192.00 meters returned 174 g/t silver, 0.26 g/t gold, 1.68% lead and 0.64% zinc.
HLD25-38 intersected multiple mineralized intervals starting at 177.00 meters depth. A 1.50 meter section of brecciated vein material returned 406 g/t silver, 0.10 g/t gold, 3.13% lead and 0.18% zinc overlying 17.80 meters of quartzite, minor vein breccia and phyllitic quartzite anomalous in silver, lead and zinc from 178.50 to 196.30 meters. The lower section of Main Fault mineralization was intersected from 196.30 to 218.30 meters, a 22 meter zone which includes a 1.90 meter strongly mineralized section averaging 437 g/t silver, 0.35 g/t gold, 14.55% lead and 4.04% zinc.
With all analytical results from the 2025 program received, management is focused on interrogating the Main Fault dataset to identify mineralization controls for the 2026 program. The company intends to start with an airborne geophysical survey in late Q1 or early Q2 of this year.
All samples were analyzed by 33 element four-acid digestion ICP-MS methods at ALS Canada Ltd. Hardline Exploration Ltd is managing the Haldane Project and utilizes a quality control and quality assurance protocol for the drill core sampling.
Silver North’s primary assets are its 100% owned Haldane Silver Project, the Tim Silver Project (under option to Coeur Mining, Inc.), and the GDR project. The company also plans to acquire additional silver properties.
Mr. Jason Weber, P.Geo., President and CEO of Silver North Resources Ltd. supervised the preparation of the technical information in the release.
For further information, contact Jason Weber, President and CEO or Sandrine Lam, Shareholder Communications at Tel: (604) 807-7217, Fax: (888) 889-4874.
Source: Silver North Resources Ltd.