Scottie Resources (TSXV:SCOT) Reports New Assays from Blueberry Contact Zone

Vancouver, British Columbia — January 6, 2026 — Leads & Copy — Scottie Resources Corp. (TSXV: SCOT) (OTCQB: SCTSF) (FSE:SR80) has announced new assay results from its 2025 drilling program at the Blueberry Contact Zone, part of the Scottie Gold Mine Project.

The road-accessible Scottie Gold Mine Project, located 35 kilometers north of Stewart, BC, includes the past-producing Scottie Gold Mine and the adjacent Blueberry Contact Zone. A Preliminary Economic Assessment (PEA) for the project was recently released (Bird et al., October 28, 2025).

CEO Brad Rouke stated that the company is pleased to kick off 2026 with strong drill results from the Blueberry Contact Zone, which remains the cornerstone to the company’s recent PEA and DSO mine plan. He added that at today’s gold prices, the open pit scenario alone has the potential to fund both mine construction and the development of the underground, which is a tremendous position for a junior company to be in.

Drilling in 2025 was designed to expand the existing resource and increase geological confidence in the known zones, supporting the planned conversion of resources from the inferred to indicated category. Results from 2025 drilling are continuing to come in. The Scottie Gold Mine zones remain open in multiple directions, representing meaningful opportunity to continue growing the Project’s overall resource base.

Highlights from the drilling include:

  • SR25-415 intersected 6.41 grams per tonne (g/t) gold over 14.00 metres (m), including 19.0 g/t gold over 4.00 m in the Fifi vein zone
  • SR25-413 intersected 3.50 g/t gold over 5.35 m including 6.35 g/t gold over 2.10 m at the Blueberry Vein Zone
  • SR25-371 intersected 20.50 g/t gold over 1.10 m at the Fifi vein zone

The Blueberry Contact Zone is located 2 km northeast of the 100%-owned past producing Scottie Gold Mine in BC’s Golden Triangle. The target was significantly advanced during Scottie’s 2019 drill program when an interval was intersected in a new N-S oriented zone adjacent to the main Blueberry Vein. The drill results received from 2020 – 2024, coupled with surficial mapping and sampling suggest that the N-S mineralized trend is a controlling structure that hosts an array of SW-trending, sub-parallel, sulphide-rich veins that obliquely crosscut it which host high-grade gold. As of the end of 2024, the extent of the N-S zone, defined by the contact between andesite and siltstone units of the Hazelton Formation and the presence of the cross-cutting sulfide-rich structures, has a drilled strike length of >1,550 metres and has been tested to >525 metres depth. The Blueberry Contact Zone is located on the Granduc Road, 20 kilometres north of the Ascot Resources’ Premier Mine. Newmont’s Brucejack Mine is located 25 kilometres to the north.

Scottie Resources holds 100% interest in the Scottie Gold Mine Property, which includes the high-grade, past-producing Scottie Gold Mine and the adjacent Blueberry Contact Zone. The Company also owns a 100% interest in the Georgia Project, host to the past-producing Georgia River Mine, as well as the Cambria, Sulu, and Tide North properties. In total, Scottie controls approximately 58,500 hectares of highly prospective mineral claims within the Stewart Mining Camp in British Columbia’s Golden Triangle.

Scottie’s current resource estimate on the Scottie Gold Mine Project includes a total of 703,000 gold ounces at an average grade of 6.1 g/t (Inferred category) in 3.6 millon tonnes. The Company’s strategy is to continue expanding this resource and to define additional mineralization around past-producing mines through systematic drilling and surface exploration.

The Company has recently completed a PEA for the Scottie Gold Mine. The PEA outlines a robust Direct-Ship Ore (DSO) development scenario with strong economics and significant upside through a potential toll-milling option utilizing excess capacity at the nearby Premier mill. The base case DSO project delivers an after-tax NPV(5%) of $215.8–$668.3 million at gold prices of US$2,600–$4,200/oz, respectively. Under the toll-milling scenario, project economics improve substantially, with an after-tax NPV(5%) of $380.1–$831.7 million (no agreement currently in place). The PEA estimates initial capital costs of $128.6 million, average annual production of ~65,400 oz gold over seven years, and a payback period of 1.7 years for the after-tax DSO case—reduced to just 0.9 years under the toll-milling opportunity at US$2,600/oz.

Results from samples taken during the 2025 field season were analyzed at SGS Minerals in Burnaby, BC. The sampling program was undertaken under the direction of Dr. Thomas Mumford. The majority of drill core was NQ in diameter, with select holes of HQ size primarily taken for geomechanical purposes. Prior to sampling drill core was cut in half lengthwise, with half sent for assay and the remaining half kept in Stewart, BC. Standards, blanks, and duplicate samples were taken at intervals and frequencies that meet or exceed industry best practices. A secure chain of custody is maintained in transporting and storing all samples. Gold was assayed using a fire assay with atomic absorption spectrometry and gravimetric finish when required (+9 g/t gold). Analysis by four acid digestion with multi-element ICP-AES analysis was conducted on all samples with silver and base metal over-limits being re-analyzed by emission spectrometry.

Dr. Thomas Mumford, P.Geo., non-independent President of the Company, a qualified person under National Instrument 43-101, has reviewed and approved the technical information contained in this news release on behalf of the Company.

Brad Rourke
CEO
+1 250 877 9902
brad@scottieresources.com

Source: Scottie Resources Corp.

×

Welcome!

Biotech Reporter is the source most up-to-date real-time, direct-from-source News Tips and Story Leads.

By Subscribing you will receive Daily Biotech Update each day at 9:30 am ET (Market Open) in your inbox and you can unsubscribe any time.