VANCOUVER, BC — January 8, 2026 — Leads & Copy — Mayfair Gold Corp. (TSXV: MFG) (OTCQX: MFGCF) has announced the results of its 2026 Pre-Feasibility Study (PFS) for the Fenn-Gib gold project in the Timmins Gold District of Ontario, Canada.
The study, prepared in accordance with National Instrument 43-101, reveals a compelling after-tax net present value (NPV) of $652 million and an internal rate of return (IRR) of 24% at a base case gold price of US$3,100 per ounce and a C$/US$ exchange rate of 1.35.
According to the news release, at a spot gold price of US$4,450 per ounce and a C$/US$ exchange rate of 1.38, the after-tax NPV increases to $1.37 billion, with an IRR of 38%.
The initial development capital costs are estimated at $450 million, with a short payback period of 2.7 years under the base case scenario and 1.7 years at the spot gold price.
The mine plan focuses on exploiting 1.04 million ounces (Moz) (24%) of the total 4.3 Moz Indicated Resource, the company said, preserving optionality for future growth.
Environmental baseline studies are well advanced, with the commencement of the Environmental Assessment and Ontario permitting process expected in early 2026.
A final investment decision is anticipated within three years, with commercial operation targeted within five years.
The PFS lead author was Ausenco Engineering ULC, with contributions from Knight Piésold Ltd., AGP Mining Consultants Inc., Ecometrix Inc. an Egis Group Company, and T. Maunula & Associates Consulting Inc.
Mayfair Gold CEO Nick Campbell stated that the 2026 PFS demonstrates the strong economics and free cash flow potential associated with developing the Fenn-Gib Gold project as a targeted, high-grade operation that can be advanced through the Ontario permitting process.
Chief Operating Officer Drew Anwyll noted that the study is a realistic representation of the estimated operating and capital costs, production profile, and overall economics of the Fenn-Gib Project, with a straightforward plan to build the mine and bring it into operation in the near term.
The study outlines Mayfair’s strategy to reduce execution risk and prioritize high-margin material early in the mine plan, supported by a realistic and financeable initial capital outlay.
The Project will proceed under the Provincial Class Environmental Assessment (EA) process and does not trigger a Comprehensive EA or federal Impact Assessment under current regulations.
Social and community engagement has focused primarily on the Apitipi Anicinapek Nation (AAN), with an active Exploration Agreement in place and plans to develop a Community Benefit Agreement for the Project.
The Project plans to advance three key strategies in parallel: Ontario-led environmental approvals, Indigenous agreements, and engineering-design-procurement, with the goal of enabling major construction within 24–36 months and commercial operations targeted within five years.
The 2026 PFS assumes an average annual gold production of 71.3 koz over the first 6-years of operation and a total life of mine (LOM) production of 920 koz over 14.3 years of operation.
The base case economics have been calculated on an unlevered basis, based on a gold price of US$3,100 and flat exchange rate of C$1.35 per US$ 1. The economics include an effective royalty rate averaging 1.7%, based on all current royalties and encumbrances associated with the reserve at Fenn-Gib.
The mine plan and associated economics reflect total gold processing of 1.04 Moz with 88.3% recovery.
The Fenn-Gib Mineral Reserves estimate is based on a design metal price of US$1,750/oz gold and is approximately 25.1 Mt of ore with a gold grade of 1.29 g/t for a contained 1.04 Moz of gold.
The initial capital cost (Capex) is estimated at $450 million including $66 million of contingency representing approximately 26% of the direct costs.
LOM unit operating costs are estimated at $59.43/tonne of ore processed. Average LOM cash costs and all-in sustaining costs (AISC) are estimated at US$1,203 and US$1,292.
During the first 6 years of operations (years 1-6), annual gold production is expected to average 71,336 oz at a feed grade of 1.47 g/t, with peak output of over 82,000 oz in year 2.
Drew Anwyll, P.Eng., Chief Operating Officer of Mayfair, has reviewed the PFS on behalf of the Company and has approved the technical disclosure contained in this news release.
The company will hold a conference call and webcast to discuss the financial results on Friday, January 9, 2026, at 10:00 am Eastern Time.
Mayfair has engaged Adelaide Capital, Swiss Resource Capital AG, and Triomphe Holdings Ltd. to enhance communication and engagement with investors and other stakeholders.
Mayfair Gold is focused on advancing the 100% controlled Fenn-Gib Project in the Timmins region of Northern Ontario, with the goal of starting construction in 2028 and initial production in 2030.
Contact:
Drew Anwyll, P.Eng., Chief Operating Officer
Source: Mayfair Gold Corp.