Vancouver, British Columbia — December 17, 2025 — Leads & Copy — Happy Creek Minerals Ltd. (TSX-V: HPY) has released assay results from its 2025 drill program at the Fox Tungsten Project in British Columbia’s South Cariboo district.
The company completed 18 diamond core drill holes at the Fox Project, totaling 2,176 meters, between September 5 and October 5, 2025. The drilling focused on expanding the tungsten resource at the Ridley Creek (RC) and BN zones.
Drilling at the RC zone has shown continuity and expansion of the calc silicate horizon to the southwest, remaining open to the west beneath Deception Mountain. Highlights from the RC zone include 1.18 meters grading 6.83% WO3 from 31.2 m downhole in hole F25-13, 1.00 meters grading 2.22% WO3 from 47.0 m downhole in hole F25-01, and 0.95 meters grading 1.11% WO3 from 36.5 m downhole in hole F25-02.
On the northwest side of the BN Zone, drilling intersected several calc silicate horizons, suggesting a stacked layer model with one horizon approximately 200 meters below the surface. The 2025 drilling indicates that the calc silicate horizons and associated tungsten mineralization are open to the west and north beneath Deception Mountain, with potential for additional horizons at depth. Highlights at the BN zone include hole F25-16, which yielded 1.00 meters grading 0.88% WO3 from 105.0 m downhole and 1.65 meters grading 0.57% WO3 from 218.3 m downhole, and hole F25-17, which yielded 2.50 meters grading 0.25% WO3 from 106.2 m downhole and 2.00 meters grading 0.79% WO3 from 215.0 m downhole.
From September 5 to October 5, 2025, Happy Creek completed 18 NQ diameter diamond core drill holes (totaling 2,175.5 meters) at the Fox Tungsten Project, targeting resource expansion at the RC and BN zones.
At the RC zone, tungsten mineralization is primarily located in the calc-silicate unit, which intercalates with a biotite schist unit. Monzogranite and alaskite sills run subparallel to cross-cutting these units. The RC zone currently measures approximately 400 meters by 175 meters, forming a gently dipping tabular body that is approximately 5 to 25 meters thick. The top of the zone is at the surface on the east side and approximately 25-75 meters below the surface to the west.
During the 2025 field season, 14 diamond core drillholes were completed at the RC zone, totaling 1,304.5 meters drilled, with an average hole depth of approximately 92 meters. The focus of the 2025 drill program at the RC zone was to explore the extent of the calc silicate hosted tungsten mineralization, primarily to the west and south, and to fill in gaps on the eastern side. Most holes were drilled to the south, an area with limited previous drilling, well beyond the southern limit of the resource area. Previous exploration work in this southern part included surface geology, rock sampling, and limited hand trenching in 2025, which returned up to 2.6% WO3 over 0.30 meters. The drilling confirmed the geological continuity of the calc silicate from the surface on the east to approximately 50 meters in thickness westward and expanded it approximately 250 meters southward from the RC zone towards the BN zone. The 2025 drilling indicates that the calc silicate horizon continues westward the entire length of the RC zone and is open beneath Deception Mountain.
The BN zone consists of three stacked calc silicate horizons intercalated with biotite schist, cut by varying thicknesses of monzogranite, alaskite to aplite intrusive sills and/or dikes. The BN zone is adjacent to the large Deception stock, a two-mica monzogranite, and the intrusive sills are generally thicker than at the RC zone.
The Middle horizon of the BN zone is the best-defined and contains most of the current resource, approximately 20 to 80 meters below the surface. Overall, the drill-defined BN zone is approximately 300 meters by 350 meters in dimension and outcrops to the east, dipping west to northwest. Scheelite mineralization at the BN zone is primarily associated with the calc-silicate zones within the intrusive sills (endo-skarn) and in the surrounding carbonate-sedimentary rocks altered to calc silicate (exo-skarn).
Four diamond core drillholes (F25-15, F25-16, F25-17, F25-18) were completed at the BN zone during the 2025 field season, totaling 871.0 meters drilled, with an average hole depth of approximately 218 meters. The 2025 drilling tested the potential for mineralized calc silicate horizons to extend to the northwest and at depth, demonstrating the resource expansion potential of the zone.
In 2018, Happy Creek published a NI43-101 Resource Estimate for the Fox Tungsten Project, including an Indicated Resource of 582,400 tonnes at 0.826% WO3, all located within the RC Zone, and an Inferred Resource of 565,400 tonnes at 1.231% WO3 located predominately at the BN Zone (453,000 @ 1.321 WO3).
The Company clarifies the following corrections to its news releases dated November 6, 2025, and November 12, 2025. Jason Bahnsen resigned as President, Chief Executive Officer and Director, and Stephen Gray was appointed as President, Chief Executive Officer and Director. The base monthly fee billed to the Company every three months in advance. On or before the first day of the calendar month in the three-month period, Small Cap shall provide an invoice to the Company for the upcoming three months. The Company will also pay Small Cap an additional $125 per hour for any additional services outside the scope of the agreement, and will pay $299 plus HST for each influencer booking made.
David Blann, P.Eng., a director of the Company, and a qualified person pursuant to National Instrument 43-101, has prepared, verified, and approved the technical and scientific contents of this release.
Contact:
Stephen Gray
Email: info@happycreekminerals.com
Source: Happy Creek Minerals