VANCOUVER, BC — January 20, 2026 — Leads & Copy — Ares Strategic Mining Inc. (CSE: ARS) (OTCQX: ARSMF) is positioned to benefit from a structural repricing in North American capital markets as bipartisan Congressional proposals for a $2.5 billion Strategic Resilience Reserve signal a federal shift toward onshoring defense-grade supply.
This legislative action aligns with a recent White House procurement directive confirming that 100% import dependencies across twelve critical minerals represent a national security vulnerability, potentially unlocking Pentagon contracts and Defense Production Act financing for domestic platforms.
According to Boston Consulting Group’s January 2026 supply chain analysis, demand for defense and semiconductor-grade minerals will exceed investment capacity by 20% to 150% through 2030. BMI’s December 2025 forecast confirms that industrial policy has become the primary mechanism for resource security, with Western governments using sole-source procurement mandates to corner domestic production, leading to valuation premiums for domestic producers.
Ares Strategic Mining (CSE: ARS) (OTCQX: ARSMF) has secured a Pentagon contract to supply acid-grade fluorspar to the U.S. Department of Defense. The multi-year deal carries an initial value of $169 million, potentially reaching $250 million over five years through an Indefinite Delivery/Indefinite Quantity agreement.
The contract positions Ares as the sole domestic supplier of acidspar to the U.S. government, supporting the replenishment of strategic mineral stockpiles.
James Walker, CEO of Ares Strategic Mining, stated that the contract transforms companies and secures the future of U.S. industry by building a resilient domestic supply chain for critical minerals.
The contract addresses a significant supply chain vulnerability, as the United States currently imports 100% of its fluorspar, used in steel production, lithium-ion batteries, semiconductors, defense systems, and nuclear fuel development. Ares operates the Lost Sheep mine in Utah, the only permitted fluorspar operation in the United States.
Ares completed major infrastructure work at its underground mine and Delta, Utah processing facility in December, including the installation of its ramp and adit system and foundations at its processing plant, with the electrics and Control and Instrumentation systems in the final stages of fitting.
The company is building two plants to produce both metallurgical-grade and acid-grade fluorspar, with an initial output of 50,000 tons per year, potentially increasing with additional ramps at Ares’ district scale fluorspar project. In November, the company completed its secondary ventilation system, meeting the final regulatory requirement for industrial-scale operations.
Financing has proceeded through non-dilutive structures. Ares closed its LIFE offering in October, raising $10.5 million total. Sharing agreements with UK firm Sorbie Bornholm delivered approximately $3.66 million in additional capital through hedging arrangements tied to the company’s share price performance.
The Lost Sheep project encompasses 5,982 acres in Juab County, Utah. Beyond fluorspar, the company has identified germanium and gallium in its ore through a research partnership with Iowa State University and Ames National Laboratory. Both minerals appear on U.S. critical supply risk lists, and gallium has not been produced domestically since 1987.
Other industry developments include Centrus Energy (NYSE: LEU) being awarded a $900 million task order from the U.S. Department of Energy to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of High-Assay Low-Enriched Uranium (HALEU). Graphite One (TSXV: GPH) (OTCQX: GPHOF) has announced independent testing results confirming elevated magnet and Heavy Rare Earth presence at the Graphite Creek deposit. USA Rare Earth (NASDAQ: USAR) reported third quarter 2025 financial results with a cash position of $258 million and no significant debt. NioCorp Developments (NASDAQ: NB) announced final assay results from its completed 2025 Department of War-funded drilling campaign at the Elk Creek Critical Minerals Project in southeast Nebraska.
CONTACT:
USA NEWS GROUP
info@usanewsgroup.com
(604) 265-2873
Source: Ares Strategic Mining Inc.