Allied Critical Metals (CSE:ACM) Receives Favorable Environmental Impact Declaration for Borralha Tungsten Project

January 12, 2026 — Leads & Copy —

Allied Critical Metals Inc. has received a favorable Environmental Impact Declaration (DIA) from the Portuguese Environment Agency (APA) for its Borralha Tungsten Project in Montalegre, northern Portugal. This declaration, subject to standard regulatory conditions, marks a significant milestone for the company.

The company also received a Letter of Recognition from idD Portugal Defense, acknowledging Allied’s role in re-establishing tungsten production in Portugal. The agency considers Allied’s Borralha Tungsten Project a strategic initiative impacting Portugal’s and Europe’s defense supply chains.

The DIA allows Allied to advance the Borralha Project to the Project of Execution and RECAPE (Environmental Compliance Report of the Execution Project) stage and subsequent licensing phases. Allied aims to complete and put the Borralha Project into production by the end of 2027.

The Borralha Project is targeting the production of tungsten, with by-products copper and tin concentrates. Tungsten is a critical raw material under the EU Critical Raw Materials Act and is used in industrial, energy transition, and defense-related applications.

The environmental approval was based on an Environmental Impact Assessment evaluating the project’s potential effects on environmental, social, and cultural factors. The assessment identified mitigation, monitoring, and compensation measures to be implemented during construction, operation, and closure.

Roy Bonnell, CEO and Director of Allied, said the DIA reflects the quality of the technical and environmental work completed and allows the company to advance the project into the next stage of permitting and detailed engineering.

João Barros, President, COO and Director of Allied, said the Borralha Project offers an opportunity to address historical environmental legacies while generating skilled employment and economic activity. He added that the company is committed to working closely with local communities, the municipality, and public authorities throughout all stages of the project.

Key design features assessed include underground mining, closed-loop water management systems, filtered tailings with dry stacking, environmental monitoring and contingency plans, rehabilitation of historical mine waste, and protection of water resources, ecosystems, and cultural heritage.

The Borralha Project is expected to generate direct and indirect employment, support local and regional suppliers, and contribute to economic activity in northern Portugal.

Following the DIA, the company intends to prepare the Borralha Project of Execution and RECAPE documentation, advance detailed engineering and technical studies, undertake additional environmental and social studies, and continue engagement with regulatory authorities and local stakeholders.

Dave Burwell
Vice President, Corporate Development
Email: daveb@alliedcritical.com
Tel: 403-410-7907
Toll Free: 1-888-221-0915

Source: Allied Critical Metals Inc.

×

Welcome!

Biotech Reporter is the source most up-to-date real-time, direct-from-source News Tips and Story Leads.

By Subscribing you will receive Daily Biotech Update each day at 9:30 am ET (Market Open) in your inbox and you can unsubscribe any time.